The Information of Shenzhen Metro and Railway route map

Shenzhen Metro Group Co., Ltd. has completed the lines 1, 2, 3, 5 and 11 in
Shenzhen rail transit project phases I, II and III, with a total length of 210km,
and construction tasks of 133 stations and lines. We have synchronously constructed Luohu,
Futian, Shenzhen North Station, Shenzhen East Station and other key transport hubs,
and completed nearly one hundred municipal agent-construction projects.
At present, Shenzhen Metro Group Co., Ltd. is undertaking 5 lines and 7 extension lines
in Shenzhen rail transit project phase III and phase III reconstruction,
with a total length about 183.9km, and the construction of Longhua
New Area Tramway Demonstration Line Project of 11.7km. At the same time,
Shenzhen Metro Group Co., Ltd. is positively preparing the construction of
the first 11 lines in phase IV, with a total length of 274km. As to the end of 2020,
about 435km metro and tramway will be opened and operated in Shenzhen, and it's expected
that the scale of rail transit network will break through 1000km in 2025.
Metro Route Map(Fare/TransferSearch)
Background
Railway Line | 17 lines as 2025 |
Number of station | 387 station |
Length of rail transit network | 583.4km |
Average daily passenger flow | Over 7.42 million passenger daily |
Shenzhen Metro Company Profile
SZMC Company Profile
|